Regensburg
The indoor swimming pool on Gabelsbergerstraße and its loyal visitors are currently waiting for the green light for the renovation. In cooperation with Stadtwerk, Kulturoptimisten are shortening this waiting time from September 18, 2026 to January 10, 2027 with a temporary use through their light shows. With Pixel Zoo Ocean, an immersive show for children and the young at heart, they transform the swimming hall into a huge digital aquarium during the day. In the evening, the artists from Projektil in Zurich bring sacred masterpieces of architectural history to life with Masterpieces.